Things to do:
  • Fix the roofOctoberish
  • Get a new furnace (current one is 49 years old)July 21st, 2011
  • Renovate the upstairs bathroom
  • Renovate the downstairs bathroom
  • Fix the electrical (house and garage)
  • Hot water tank (near end of life) – July 21st, 2011
  • New exterior doors
  • Basement window wells – found out not required
  • Basement windows
  • Air circulation fixes – July 21st, 2011
  • Fix the garage doors / get new ones – Not happening (new Garage instead)
  • New garage
  • Change the basement carpet
  • Stairwell
  • Concrete restoration
  • Knockout the basement storage area (there’s a wall that’s gotta go)
  • Grade the landscape (away from the house)
  • Fix the trees
  • Trim the bushes on the front side of the house (project Lilac)July 15th, 2011
  • Sand/Fix the deckIn progress – Pretty much done – Done?
  • Replace windows
  • Fireplace
  • Paint living room
  • Paint Master bedroomJuly 17th, 2011
  • Paint Office – July 19th, 2011
  • Paint exterior
  • Sand/treat exterior wood
  • Window flashing
  • 7 Upstairs windows
  • Scope the main sewer drain – July 15th, 2011
  • Fix the main sewer drain (roots, etc)
  • Water pressure controller (we’re at 110psi – normal is 60-70psi)August 1st, 2011
  • Water shutoff valve replacement (currently seeps)
  • Fix stove exhaust (outside please) – July 21st, 2011
  • Bring dryer exhaust up to code – July 21st, 2011
  • Reface the outside stucco
  • New MailboxMarch 31st, 2011
  • Inspect / Seal foundation corners
  • Paint downstairs bedroom – August 1st, 2011
  • Paint downstairs living area – August 1st, 2011
  • New baseboards
  • Frame windowsMarch 2011
  • New ToiletsAugust 6th, 2011
  • Fix rotting boards on the deckAugust 17th, 2011
  • New doorsOctober 23rd, 2011

Appliances to get/replace:
Tools to get: